Dear Monty: We have decided to build a new home. We have seen no existing home we like well enough to own. What are the actual steps in the construction process?
Monty’s Answer: Assuming a poured concrete full basement and a 2,500-square-foot ranch home, without comment on cost, financing, timetable or builder variances in step order, here are the actual steps.
The Beginning Phase
No. 1: Locate the home site. Choose from three sites. Here are some tips on how to choose a builder. No. 2: Design the home to fit the lot. Designing the home first may limit your site selection. No. 3: Clear the lot and excavate the foundation. Ensure your final grade will direct water flow away from the house. No. 4: Pour footings and basement walls. Precision here is a necessary component. Subsoils must be sufficient to support the weight of the home. No. 5: Insulate the foundation. Insulation reduces energy costs. Include drain tile and sump at the base. Water is the eternal enemy. No. 6: Backfill with appropriate soil for the home site. A poured foundation or concrete block, depending on soil type. No. 7: Public utilities. Laterals for sewer and water plus electric and natural gas. A rural lot requires a drilled well….
-
Recent Posts
-
Archives
- May 2025
- April 2025
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
- February 2022
- January 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- September 2013
- July 2013
- March 2013
- January 2013
- December 2012
- November 2012
- December 1
-
Meta